top of page

OREGON HEALTH & SCIENCE UNIVERSITY’S CENTER FOR HEALTH AND HEALING

Environmental Controls Corp. ECC Portland. Building Management Systems. Building Controls. HVAC. ECC Oregon. Building Management System controls. BMS. EMCS.

COLLEGES AND UNIVERSITIES


Good Controls Systems helps keep colleges and universities running smoothly and productively so they’re prepared to handle the many challenges that inevitably arise. How well a higher education institution manages its facilities can directly affect its reputation, impact staff and student satisfaction rates, and even serve as a significant driver for enrollment.

There are many reasons why a good Controls system/installation is important for universities and colleges, but some of them are to improve the overall IAQ within buildings, Optimizing Energy usage, and being prepared for threats to the system via Cyber attacks or threats.

At Environmental Controls we are responsible for adherence to all design codes, its installation and implementation, which, as a result, improves the comfort and well-being of occupants, and reflects in the health and well-being of students and staff.

Implementing good HVAC controls design can affect a building in several ways, such as enhancing resistance to cyber threats, minimizing unwanted downtime, increasing staff productivity, and improving energy efficiency and sustainability.

For instance, working closely during the design phase of a project early, helps us to understand the needs of the campus so that we can help to develop and install an effective Controls systems, which will meet the needs of the college/university.

With our long-standing relationships with various colleges and Universities in Oregon and SW Washington, we at Environmental Controls Corporation have gained a reputation for being a fair and competent and local Control systems provider.

With offices in Portland Oregon, Bend Oregon, and Vancouver Washington, we are well suited to take care of your HVAC/Control needs.

We make Buildings Work!

 

Environmental Controls Corp. ECC Portland. Building Management Systems. Building Controls. HVAC. ECC Oregon. Building Management System controls. BMS. EMCS.

OREGON HEALTH & SCIENCE UNIVERSITY’S CENTER FOR HEALTH AND HEALING

The U.S. Green Building Council has awarded Oregon Health & Science University’s Center for Health & Healing LEED Platinum certification for energy efficiency and environmental sustainability. OHSU is the first medical and research facility anywhere to have achieved this distinction.

 

The center, located in the South Waterfront district of Portland, is one of only 30 buildings of all kinds in the country to have been awarded Platinum Certification and the largest and most complex medical building in the country to have achieved it. Based on LEED standards, OHSU is 61% more energy efficient than required by Oregon Code.

Environmental Controls contributed to LEED points through a variety of means – Energy and Atmosphere, Indoor Environmental Quality and Sustainable Sites.

 

ECC is using Alerton’s BACnet building automation system to control and monitor all aspects of the building’s thermal comfort. Temperature in the building is measured and trended to verify occupant comfort. Working in association with the design engineer and balancing agent, ECC developed outside air flow curves for all of the main Air Handling Units. An advanced algorithm is used to determine the real-time position of each main air handling unit’s outside airflow compared to the actual fan capacity. The data is then trended and used to calculate the required damper position for maintaining the outdoor air ventilation set point. Heat recovery coils are used in the main air handlers to allow for increased ventilation during both extremely cold and hot days.

 

A thermal storage system consists of 4-Thermal Storage Tanks, one of which provides reheat to the domestic hot water system, 3-swimming pools, 3-radiant slab zones on the ground floor, and 1-heat recovery/water reclamation tank. The swimming pools are integrated with the heating and cooling system as a thermal storage unit.

Waste heat is generated by a gas-fueled cogeneration system powered by five 60-kilowatt microturbines. A heat exchanger is tied into the condenser loop of the Process Cooling Chiller to allow for further heat recovery when the main chillers are not in operation.

 

Heat contained in the main exhaust air from the two Research Lab Floors is recovered using 2 Air-to-Water Heat Exchanger Coils located on the roof. This recovered heat is then used to preheat the makeup air entering the Research Labs.

The south side of the building on the 15th and 16th floors was transformed into a giant solar air heater by creating a 6,000 square foot Trombe wall consisting of two glass skins. The warm air produced inside the Trombe wall by the greenhouse effect is recirculated through the building in winter, reducing the building’s energy use.

 

Both the Thermal Storage and Heat Recovery systems are integrated together and controlled by the Alerton BAS to keep the building operating at maximum energy efficiency.

 

Chilled beams combine convective cooling systems with displacement ventilation, which reduces energy use by twenty to thirty percent compared to conventional air conditioning systems and reduces the need for ductwork and other mechanical systems.

 

The building includes a 100% rainwater reclamation system that harvests rainwater and wastewater for landscaping. Potable water use is reduced by 56%, and no potable water is used for waste conveyance or irrigation in the building. ECC controls and monitors the rainwater reclamation system, which saves thousands of gallons of water each day from ever reaching the city’s sewer system. Additionally, there is a wastewater treatment facility inside the building. This system works in parallel with the water reclamation system and is monitored and alarmed by ECC. All of the wastewater generated by the building is processed through this system. The processed clean effluent water is then stored in a large tank and can be used as non-potable water backup for times when rainwater and groundwater sources are not available.

 

Integration was a key aspect of the project. With so many complex systems needing to work together, it was imperative to use a controls contractor with extensive systems integration experience. By using industry-standard protocols, this high level of integration was achieved cost-effectively. OHSU is using BACnet as the foundation protocol for integration.

For example, all of the main lighting controls are integrated into the Alerton system using MODBUS to BACnet, allowing building operators to use a common interface and set of tools for scheduling HVAC and lighting.

 

By integrating the 6 Fulton Boilers to BACnet, ECC is able to enable and disable the boilers and provide them with the loop temperature setpoint, as well as monitor all of the boiler functions and alarms. To maintain this many points and alarms using a conventional input/output method would have been cost-prohibited.

The 22 native BACnet ABB VFDs are integrated into the same MS/TP network as the field controllers. Installation costs were reduced by only having to run a single network for all devices.

 

Another important part of ECC’s involvement in the project was assisting the commissioning agent in development of the commissioning forms, as well as assisting in the commissioning process. Working with the design engineer and commissioning agent, ECC developed control strategies that will optimize building system performance while using a minimum amount of electrical power and natural gas.

 

Trend logs and energy logs were set up for every measured point in the building to verify system operation. ECC engineers were available to provide support as requested enabling the commissioning agent to perform all enhanced commissioning activities.

 

OHSU Center for Health and Healing represents the state-of-the-art in integrated green design as well as being a cost-effective project. Both the mechanical and electrical systems came in under the $30 million allotted for a standard design.

COLLEGES AND UNIVERSITIES GALLERY

  • Instagram
  • Twitter
  • Facebook
  • LinkedIn

Environmental Controls Corp.
Tigard Office – (headquarters) 503.620.4228 info@eccportland.com • Redmond Office 503.620.4228 • Vancouver Office 503.620.4228

bottom of page